Opening the shop
I learned to start a business by doing it. I’m at my best tackling a new challenge.
Why we had to open before the holidays
Up to 60% of a year’s sales came between November and Valentine’s Day. Opening after the holidays would have meant almost a full year of rent, payroll and loan payments before our next big season.
While funding was on hold
Waiting on a new leaseJul–Dec 2013- Expanded the product line to smooth out summer sales
- Grew holiday sales 50% as a cottage food business
- Launched the website and social media
- Brought in a legacy enrober from my father’s former company, saving over $50,000
- Found a better space and chose an architect
While plans moved through the city
Waiting on plan review and permitsJan–Jul 2014- Re-sized the capital plan to about $375,000 and closed the loan
- Architect and engineering plans, including a redesign for an accessible restroom
- Brand, packaging and website design with a brand designer
- Designed custom display furniture and ordered it from an overseas maker
- Chose the box supplier and ordered Italian equipment
Racing the holidays
No more waiting: every track ran at onceJul–Oct 2014- Construction, ten loan draws and continual budget re-forecasts
- Installed equipment and got the enrober running with its European maker
- Finalized the product line and began making product for the grand opening
- Hired and trained the team
- Display furniture installed, ingredients and materials ordered and delivered
- Packaging arrives, doors open October 23
The project plan, workstream by workstream
Each bar spans a workstream from its first task to its last, with a dot wherever the plan changed. Select a workstream to see its tasks.Every task, grouped by workstream, with its dates, owners and what it depended on.
Where the dates come from →
Dates come from our loan updates and commitment letters, the lease, permit applications and city review comments, contracts, invoices, our budget files my own construction timeline from May 2014 and Community Impact’s coverage of our October 23 opening. Two dates are estimates and are shown as dashed bars: the building permit (between our June 19 answers to plan review and the July 22 construction contract) and the final health permit and certificate of occupancy (mid-October).
The situation
- By 2013 I’d worked in structured finance at Goldman Sachs and run a fine-dining restaurant in Argentina, but I’d never formed a company, borrowed for one or signed a commercial lease.
- Chocolaterie Tessa started as a cottage food business from my apartment. To grow, we needed a commercial kitchen, a storefront and about $375,000 to build both.
- Along the way we lost our first lease, redrew the floor plan for an accessible restroom, absorbed a fire-code change and watched our main machine fail its first start-up.
- Through all of it, the deadline held: the shop had to open in time for its first holiday season, our biggest sales window of the year.
What I did
- Matched the loan to the lender. Goldman taught me that banks and bankers specialize, in SBA loans, development or working capital, so I built a relationship with an Austin bank active in SBA lending.
- Won a loan commitment in June 2013, then lost the lease. Found a better space, signed it December 31 and had the bank’s renewed commitment by January 9.
- Ran the opening as one plan across nine workstreams and more than a dozen partners, from the bank, architect and city reviewers to overseas furniture and packaging suppliers.
- Re-sized the loan for the fire code and higher fees, then re-forecast the budget 44 times as construction ran.
- Opened our doors October 23, 2014, ahead of the holidays and a year and a half after our first loan request.
What I learned
- Waiting is working time. Knowing how the pieces fit together let me fill every delay with work that moved the opening forward.
- While we searched for the right space, we deepened our relationship with the lender, refined the business plan and built a following that grew holiday sales 50%.
- While the build-out moved through city review and construction, we created our brand, website and packaging.
- A setback is a revised plan, not a stop. The lost lease led to a better space, and each surprise became a new set of numbers.